Update Rust crate log to v0.4.29 #19

Open
renovate-bot wants to merge 1 commit from renovate/log-0.x-lockfile into master
Collaborator

This PR contains the following updates:

Package Type Update Change
log dependencies patch 0.4.28 -> 0.4.29

Release Notes

rust-lang/log (log)

v0.4.29

Compare Source


Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [log](https://github.com/rust-lang/log) | dependencies | patch | `0.4.28` -> `0.4.29` | --- ### Release Notes <details> <summary>rust-lang/log (log)</summary> ### [`v0.4.29`](https://github.com/rust-lang/log/blob/HEAD/CHANGELOG.md#0429---2025-12-02) [Compare Source](https://github.com/rust-lang/log/compare/0.4.28...0.4.29) </details> --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0MS40My43IiwidXBkYXRlZEluVmVyIjoiNDEuNDMuNyIsInRhcmdldEJyYW5jaCI6Im1hc3RlciIsImxhYmVscyI6W119-->
Some required checks are missing.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin renovate/log-0.x-lockfile:renovate/log-0.x-lockfile
git switch renovate/log-0.x-lockfile
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
bitsquid_dt/p2p!19
No description provided.